Skip to content
Free calculator · no sign-up

RPE calculator

Enter a set you did and how hard it felt. You get your estimated one-rep max from the standard RPE chart and a full table of loads for 1 to 10 reps at every RPE from 6 to 10.

1 Your set

kg
reps

2 Rounding

Round loads to

Estimated 1RM from RPE

—

Est. 1RM–
kg

This set–
Reps in reserve–
Same reps at another RPE–

RPE load chart

Load for each rep count and RPE, based on your estimated 1RM. The row for your rep count is highlighted.

RepsRPE 10RPE 9.5RPE 9RPE 8.5RPE 8RPE 7.5RPE 7RPE 6.5RPE 6

RPE to RIR chart

RPEReps in reserve (RIR)What it feels like
100Maximum effort. No more reps and no more load.
9.50No more reps, but you could have added a little weight.
91One more rep was there.
8.51–2One more for sure, maybe two.
82Two more reps were there.
7.52–3Two more for sure, maybe three.
73Three more reps. The bar still moves fast.
6.53–4Three more for sure, maybe four.
64Four more reps. Feels like a last warm-up set.

Embed this calculator

Free to use on your website or blog. Paste this code where you want the calculator to appear.

Free forever, no ads inside the widget. Please keep the credit link below the calculator.

Preview

How the RPE calculator works

The calculator uses the percentage chart made popular by Mike Tuchscherer's Reactive Training Systems. Each combination of reps and RPE maps to a share of your one-rep max. A set of 5 at RPE 8 leaves two reps in reserve, so it is treated like a 7-rep max, which the chart puts at 81.1%. Divide the weight on the bar by that share and you have an estimated 1RM.

estimated 1RM = weight / (chart % / 100) RIR = 10 − RPE % of 1RM by reps and RPE RPE 1 rep 2 3 4 5 6 7 8 9 10 10 100 95.5 92.2 89.2 86.3 83.7 81.1 78.6 76.2 73.9 9.5 97.8 93.9 90.7 87.8 85.0 82.4 79.9 77.4 75.1 72.3 9 95.5 92.2 89.2 86.3 83.7 81.1 78.6 76.2 73.9 70.7 8.5 93.9 90.7 87.8 85.0 82.4 79.9 77.4 75.1 72.3 69.4 8 92.2 89.2 86.3 83.7 81.1 78.6 76.2 73.9 70.7 68.0 7.5 90.7 87.8 85.0 82.4 79.9 77.4 75.1 72.3 69.4 66.7 7 89.2 86.3 83.7 81.1 78.6 76.2 73.9 70.7 68.0 65.3 6.5 87.8 85.0 82.4 79.9 77.4 75.1 72.3 69.4 66.7 64.0 6 86.3 83.7 81.1 78.6 76.2 73.9 70.7 68.0 65.3 62.6

Read along a diagonal and the numbers repeat: 1 rep at RPE 9 equals 2 reps at RPE 10. The chart is built on that idea. Reps done plus reps left gives the rep-max the set is equivalent to.

RPE and RIR: the scale explained

The lifting version of RPE is different from the 6–20 Borg scale used in cardio testing. It was adapted for resistance training and later validated against bar speed in trained squatters. The anchor is always reps in reserve (RIR). Below about RPE 6 the scale stops being useful for load selection, because nobody can tell five reps in reserve from seven.

How to use RPE in a program

A prescription like "3 sets of 5 at RPE 8" means: work up to a weight you could have done for seven, and do it for five. On a good day that weight is heavier than last week. After a bad night's sleep it is lighter. Either way the effort stays where the program wants it. This is called autoregulation.

The load chart above the article gives you a starting weight for any prescription. Say your plan calls for 4 reps at RPE 7 and your estimated max is 150 kg. The chart says 81.1%, so load about 122 kg. Log the RPE you really felt after the set, enter it here, and the estimate updates for next time. Many lifters also use the chart for back-off sets: hit a top set at RPE 8, then drop the load by 5–10% for the remaining volume.

Getting better at rating sets

Rate the set the moment you rack the bar. Watch bar speed on the last rep: a rep that slows down sharply is usually an RPE 9 or higher. Record a few sets from the side and compare your rating with how the lift looked. Every few months, take a safe exercise to real failure so you remember what RPE 10 feels like.

Limitations

The percentages are averages. Lifters with more endurance get more reps at a given percentage than the chart assumes, and the pattern differs between lifts: most people can grind more reps at 80% on a squat than on an overhead press. Sets above 10 reps and below RPE 6 fall outside the chart. If the estimate from a set of 8 at RPE 7 disagrees with a recent heavy single, trust the single.

Frequently asked questions

What does RPE mean in lifting?

RPE stands for rating of perceived exertion. In strength training it is a 1–10 score for how hard a set was, anchored to how many more reps you could have done. RPE 10 means none, RPE 9 means one, RPE 8 means two. It lets a program set effort directly, so the load adjusts to how strong you are that day.

What is the difference between RPE and RIR?

They describe the same thing from opposite ends. RIR is reps in reserve, the number of reps you had left. RPE is 10 minus RIR, so 2 reps in reserve is RPE 8 and 3 in reserve is RPE 7. Half points cover the in-between cases: RPE 8.5 means one more rep for sure and maybe a second.

How do I calculate my 1RM from RPE?

Find the percentage that matches your reps and RPE in the chart, then divide the weight by it. Five reps at RPE 8 is 81.1% of 1RM, so 100 kg × 5 at RPE 8 gives 100 / 0.811 = 123 kg. This calculator does the lookup for you and fills in every other rep and RPE combination from that number.

What RPE should I train at?

Most strength and muscle-building work is programmed between RPE 7 and 9, which leaves one to three reps in reserve. That is hard enough to drive progress without the fatigue of grinding every set to failure. RPE 10 is usually kept for testing or for the last set of small accessory lifts.

How accurate is RPE?

It depends on experience and on how close the set is to failure. Studies of trained lifters show they judge reps in reserve fairly well on heavy sets near failure and less well on lighter, longer sets. Beginners tend to underestimate what they have left. Filming sets or occasionally taking a set to true failure helps calibrate.

Sources & further reading

  1. Zourdos MC, Klemp A, Dolan C, Quiles JM, Schau KA, Jo E, Helms E, Esgro B, Duncan S, Garcia Merino S, Blanco R (2016). Novel resistance training-specific rating of perceived exertion scale measuring repetitions in reserve . J Strength Cond Res 30(1):267–275 · doi:10.1519/JSC.0000000000001049
  2. Helms ER, Cronin J, Storey A, Zourdos MC (2016). Application of the repetitions in reserve-based rating of perceived exertion scale for resistance training . Strength Cond J 38(4):42–49 · doi:10.1519/SSC.0000000000000218
  3. Hackett DA, Johnson NA, Halaki M, Chow CM (2012). A novel scale to assess resistance-exercise effort . J Sports Sci 30(13):1405–1413
  4. Tuchscherer M (2008). The Reactive Training Manual: Developing your own custom training program for powerlifting . Reactive Training Systems (book)